Watch a remodel run, week by week
This is the same dashboard our clients get on a private link. Press play or pick a week to see how an 8-week kitchen and hall bath remodel in Vancouver, WA moved from demo day to final inspection — schedule vs. actual, site notes, inspections, and every document signed along the way.
Schedule vs. actual
Week of Mar 3 — site log
Site protection installed, kitchen and hall bath demoed to studs, dumpster staged in driveway.
Documents
Scope status at week 1
| Phase | Detail | Status |
|---|---|---|
| Demolition & disposal | Kitchen + hall bath to studs, haul-off included | Complete |
| Framing & dry rot repair | New 6' opening, sink wall plate replacement | In progress |
| Plumbing rough & trim | Island sink relocation, new fixtures | Scheduled |
| Electrical rough & trim | 2 new circuits, can lights, under-cabinet | Scheduled |
| Insulation & drywall | R-15 walls, level 4 finish, texture | Scheduled |
| Cabinetry & counters | Shaker cabinets, quartz counters | Scheduled |
| Flooring & tile | White oak flooring, tile backsplash | Scheduled |
| Paint & trim | Walls, ceilings, base and casing | Scheduled |
| Final inspection & closeout | County final, punch list, warranty packet | Scheduled |
Why this matters: nothing on your job changes price or scope without a written, signed change order — like Change Order #1 above. You see the delay the day it happens, not at the end.
Get a real schedule, not a guess.
Every RestorationRepublic client gets a private dashboard like this one — weekly progress, documents, and a single point of contact.
Request an EstimateStart your own project dashboard
Tell us what you’re planning and we’ll follow up with a walkthrough and a real schedule.
Tap to call (971) 236-8506